Close

Stage Project

Title:2013 National Beach Volleyball Tournament Jinjiang Stand--Stage Project

Description: 2013 National Beach Volleyball Tournament Jinjiang Stand, which can accommodate 1200 audience

MORE>>

Title:2013 FIVB Beach Volleyball World Tour Xiamen Stand --Stage Project

Description: 2013 FIVB Beach Volleyball World Tour Xiamen Stand, which is one of the three top events for the FIVB, together with The World Olympic Games and The World Championship. It is the international A grade game hold by the FIVB and it is also the highest level beach volleyball match hold by our country.
The main field is made up of 1500 sets of movable stands, four groups of stand include two length, which is 36m and 20m. The front row height is 2m and the podium has 12 row and totally 630 seats; the back tow height is 7m. The 36m length stand has 9 row and 600 seats, the back row height is 6m; the 20m length row has 9 row and 300 seats, the back row height is 6m.

MORE>>

Title:2014 The 26th IAAF World Cup Race Walking stand--Stage Project

Description: 2014 The 26th IAAF World Cup Race Walking stand started from May 3rd to 4th, about 360 athletes from 48 countries and regions attend the race.

MORE>>

Title:The Beijing Olympic Games One Year Countdown Event Stand--Stage Project

Description: It is one year countdown event for Beijing Olympic Games on August 8th, 2007. The IOC officials and representatives from 205 countries and regions attend the celebration events.
Rapid Scaffolding company got the stand order from The Beijing Olympic Games Opening and Closing Operation Center about 15 days earlier than the event. Rapid Scaffolding finished and delivered the goods to Tian’anmen Square on time, and finished assembling just in one day, which is highly appreciated by Beijing IOC.

MORE>>

Title:Nantong Sport Convention and Exhibition Center--Stage Project

Description:  October 15th, 2006, 16th sports game of Jiangsu Province and evening show held in Nantong Sport Convention and Exhibition Center. Nantong Sport Convention and Exhibion Center is named as “South Chinese national stadium”, total invest is 2200 Million RMB, it’s the fist stadium which use the the huge movable roof in China, total height is 54.2m. In order to hold a luxurious games, the organizing committee decided to built two set 66m scaffolding tower on the two ends of the stadium, to carry Adam and Eve fly into the stadium from outside, then fly out, to the harmonious society.
   This is the highest scaffolding tower in the evening show all over the world. The scaffolding design used the “tumbler” idea.
   The project used 80 Ton scaffolding to erect for 8.5 days, 25 workers each day,. these are all the best. Then we get the praise of Organizing Committee because of the excellent work.

MORE>>

Title:Stage and lighting tower of Wuxi Third Qingdao Beer Festival --Stage Project

Description: This project is in Wuxi sport center, stage is C type, whole system’s internal height is lower the external, to make a biger stage and lighting space, otherwise, this proejct have another 4 x 4 x 8m lighting and stereo tower.

Rapid scaffolding showed its stable and high loading bearing capacity, meeting the stage and lighting needs, all the scaffolding is beautiful, harmonize together with surrounding environment.

MORE>>

Title:Stage and lighting tower of Wuxi Third Qingdao Beer Festival --Stage Project

Description: This project is in Wuxi sport center, stage is C type, whole system’s internal height is lower the external, to make a biger stage and lighting space, otherwise, this proejct have another 4 x 4 x 8m lighting and stereo tower.

Rapid scaffolding showed its stable and high loading bearing capacity, meeting the stage and lighting needs, all the scaffolding is beautiful, harmonize together with surrounding environment.

MORE>>

Title:Stage and lighting tower of Wuxi Third Qingdao Beer Festival --Stage Project

Description: This project is in Wuxi sport center, stage is C type, whole system’s internal height is lower the external, to make a biger stage and lighting space, otherwise, this proejct have another 4 x 4 x 8m lighting and stereo tower.

Rapid scaffolding showed its stable and high loading bearing capacity, meeting the stage and lighting needs, all the scaffolding is beautiful, harmonize together with surrounding environment.

MORE>>

Title:Stage and lighting tower of Wuxi Third Qingdao Beer Festival --Stage Project

Description: This project is in Wuxi sport center, stage is C type, whole system’s internal height is lower the external, to make a biger stage and lighting space, otherwise, this proejct have another 4 x 4 x 8m lighting and stereo tower.

Rapid scaffolding showed its stable and high loading bearing capacity, meeting the stage and lighting needs, all the scaffolding is beautiful, harmonize together with surrounding environment.

MORE>>