Description:It covers an area of about 140000㎡. A total construction area of 500000 square meters, from A, B, C building and basement, one floor underground, 9 floors on the ground,27 floors total.A total construction area of about 196000 square meters, the entire cast-in-place reinforced concrete shear wall structure.
Rapid Scaffold mainly undertake the main building of the adjacent two nest between pouring concrete shoring scaffolds. The shoring frame height is 31m,the upper concrete thickness is 500mm.According to the site situation,Rapid Scaffold used 1.2m ledger , 0.9m ledger ,and adjustable base jack, perfect solved the problems of the scene, effectively improve the time limit for a project schedule.